Reconstruction and modernization of wastewater treatment plant with a capacity of 76.300 PE. The project consisted of 12 new buildings, and reconstruction of existing structures with an emphasis on the needs of the newly proposed technologies. Reconstruction took place during normal operation of the existing WWTP.

Client

Město Příbram

Value

174.000.000 CZK excl. VAT